42nd St. Bathroom Project

The plan for this project was to re-locate all plumbing with a new tub in back area of the bathroom.  After the bathroom demo, we discovered dry rot damage to the floor and wall in the tub location. Our talented guys were able to re-build this entire area for proper support and finish as needed. As seen in the after picture, the old tub has now been replaced with a new dark vanity/vintage-style quartz top. We used classic black and white tiles with some satin gold cabinet pulls as accents.